CM-at-Risk standard contracts (CMAR-1) correspond to which form?

Explanation:
In CMAR, the owner hires the construction manager to act as the project lead from design through construction, typically with a guaranteed maximum price, so the contract is directly between the owner and the CM. That arrangement is captured by the Standard Form of Agreement, Owner-CM, which is specifically designed for an owner-construction manager relationship. The other forms imply the CM is acting as a contractor under general conditions or use a different pairing (CM as the contractor or CM-Contractor), which doesn’t fit the CMAR delivery method.

In CMAR, the owner hires the construction manager to act as the project lead from design through construction, typically with a guaranteed maximum price, so the contract is directly between the owner and the CM. That arrangement is captured by the Standard Form of Agreement, Owner-CM, which is specifically designed for an owner-construction manager relationship. The other forms imply the CM is acting as a contractor under general conditions or use a different pairing (CM as the contractor or CM-Contractor), which doesn’t fit the CMAR delivery method.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy