Guaranteed Maximum Price is associated with which delivery-method combination?

Become proficient in Construction Management. Study with flashcards and multiple choice questions, each question is detailed with hints and explanations. Excel in your exam!

Multiple Choice

Guaranteed Maximum Price is associated with which delivery-method combination?

Explanation:
Guaranteed Maximum Price represents cost certainty where the construction manager accepts responsibility for delivering the project at or below a capped price. This setup is the hallmark of the CM at risk approach: the CM collaborates with the owner during design, then commits to a GMP that sets the maximum the owner will pay, with the CM absorbing cost overruns and sharing savings. In a design-build context, the design and construction are combined under one contract, making it practical to establish a GMP once the scope is defined, so cost control remains centralized under the integrated team. For these reasons, the combination of CM-At-Risk with Design-Build best aligns GMP with the delivery method. Traditional design-bid-build, time-and-material or unit-price pricing, and purely separate design and construction do not inherently center around a GMP in the same way.

Guaranteed Maximum Price represents cost certainty where the construction manager accepts responsibility for delivering the project at or below a capped price. This setup is the hallmark of the CM at risk approach: the CM collaborates with the owner during design, then commits to a GMP that sets the maximum the owner will pay, with the CM absorbing cost overruns and sharing savings. In a design-build context, the design and construction are combined under one contract, making it practical to establish a GMP once the scope is defined, so cost control remains centralized under the integrated team. For these reasons, the combination of CM-At-Risk with Design-Build best aligns GMP with the delivery method. Traditional design-bid-build, time-and-material or unit-price pricing, and purely separate design and construction do not inherently center around a GMP in the same way.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy